Cochran Marine Signs Agreement with Halifax

The Halifax Port Authority is initiating the construction of a shore power system in conjunction with Cochran Marine. Located in Nova Scotia, the Port is anticipating an influx of cruise ships. Beginning in September 2014, the port will enable their shore power system at the Port’s Pier 20, 21, and 22. The system will support up to a 20MW ship hotel load.