Brooklyn – Red Hook Cruise Terminal

The next Cochran Marine Shore Power System scheduled to come online in 2015 is the Red Hook Cruise Terminal System in Brooklyn, NY.

Long Beach – Cruise Terminal Shore Power System

This Cochran Marine Shore Power System came online in December 2011.

San Diego – B St Cruise Ship Terminal Shore Power System

The Cochran Marine Shore Power System installed at the Port of San Diego B Street Cruise Ship Terminal was unveiled in December 2010.

San Francisco – Pier 27 Shore Power System

The San Francisco Shore Power installation was the first installation in the state of California and came online in October 2010.

Seattle

Cochran Marine completed the relocation of both the Princess Cruise Lines and Holland America Lines Shore Power Systems from Seattle Terminal 30 to Terminal 91 in 2009.

Seattle – Terminal 30 Holland

Cochran Marine provided Design and Installation services for the Holland America Shore Power project in 2006. The project was very similar in scope to the Princess Cruise Lines project and was located at the same terminal.

Seattle – Terminal 30 Princess Cruise Lines

Cochran was contracted to design and install the first commercial shore power system in the continental United States by Princess Cruise Lines in late 2004.

Vancouver – Canada Place Shore Power System

Cochran Marine completed the design and installation of two Shore Power Systems for the Vancouver Port Authority in 2009.


Some of our partners

Port-Metro-Vancouver
portsanfran
holland